EP GROUP | Certified Electrical Solutions Since 2007

Projects

EPC Work – BAB Artificial Lift Phase II Project (ADNOC Onshore)
UAE
Oil & Gas Infrastructure

Project Overview

The BAB Artificial Lift Phase II Project for ADNOC Onshore required reliable DC protection components to support artificial lift systems within a critical oilfield environment. The project demanded certified electrical solutions capable of operating under harsh site conditions while maintaining high safety and performance standards.


Our Role

Emirates Panel executed the supply scope for DC molded case circuit breakers (DC MCCBs) as part of the EPC call-out works. The scope emphasized compliance with ADNOC technical specifications, reliable performance in oilfield applications, and adherence to project timelines.


Scope of Supply

  • ABB DC Molded Case Circuit Breakers (DC MCCBs) for artificial lift systems

  • Certified components suitable for oil & gas field applications

  • Technical documentation and compliance support aligned with ADNOC standards


Challenges & Solutions

Oilfield artificial lift systems require dependable DC protection to ensure stable operation of lifting equipment and associated control systems. Emirates Panel ensured correct rating selection, compliance verification, and timely delivery to support EPC execution schedules.


Outcome

The supplied ABB DC MCCBs contributed to safe and reliable protection within the BAB Artificial Lift Phase II infrastructure. Emirates Panel’s performance ensured compliance with ADNOC requirements and seamless integration within the EPC framework.


Project Highlights

  • ABB DC MCCBs supplied for artificial lift applications

  • Invoiced and delivered in May 2025

  • 100% compliance with ADNOC Onshore specifications

  • Reliable supply support for oilfield EPC works

Share

Related Posts