EP GROUP | Certified Electrical Solutions Since 2007

Projects

Salalah Data Mining Farm – 45MW
Oman
Data Mining , High-Capacity Power Infrastructure

Project Overview

The Salalah 45MW Data Mining Farm project required large-scale electrical infrastructure to support continuous high-load operations. Designed for energy-intensive computing activities, the facility demanded reliable medium- and low-voltage systems capable of maintaining stable performance under sustained power consumption.


Our Role

Emirates Panel was engaged to supply key electrical infrastructure components supporting the facility’s power distribution architecture. The scope included coordination of medium-voltage and low-voltage equipment to ensure system reliability and compliance with project requirements.


Scope of Supply

  • Medium-voltage cables for primary power distribution

  • Ring Main Units (RMUs) for MV network switching and protection

  • Medium-voltage transformers for step-down power conversion

  • Low-voltage panels for downstream power distribution

  • Technical documentation and coordination support


Challenges & Solutions

High-capacity data mining facilities require stable power delivery with minimal downtime. Emirates Panel ensured proper specification alignment between MV and LV systems, coordinated delivery schedules, and supported smooth integration across the power infrastructure chain.


Outcome

The supplied MV and LV infrastructure components enabled reliable power distribution across the 45MW data mining facility. Emirates Panel’s involvement supported operational continuity and scalable infrastructure development.


Project Highlights

  • MV cables, RMUs, transformers, and LV panels supplied

  • 45MW high-capacity infrastructure support

  • Invoiced and delivered in December 2023

  • Reliable supply coordination for energy-intensive operations

Share

Related Posts