Ethiopia Data Mining Farm – 40MW
Ethiopia
Data Mining , High-Capacity Power Infrastructure

Project Overview

The Ethiopia 40MW Data Mining Farm project required high-capacity medium-voltage power infrastructure to support large-scale, continuous computing operations. The facility demanded robust and scalable electrical systems capable of delivering stable power under sustained high-load conditions.


Our Role

Emirates Panel was engaged to supply key medium-voltage electrical components forming part of the project’s primary power distribution network. The scope focused on correct technical specification, reliability, and coordinated delivery aligned with project timelines.


Scope of Supply

  • Medium-voltage transformers for primary power distribution

  • Medium-voltage cables for power transmission and interconnection

  • Technical documentation and coordination support


Challenges & Solutions

High-capacity data mining operations require dependable MV systems to ensure uninterrupted performance and equipment protection. Emirates Panel ensured accurate transformer sizing, compliant cable selection, and timely delivery to support smooth installation and commissioning.


Outcome

The supplied MV transformers and cables enabled stable and reliable power distribution across the 40MW data mining facility. Emirates Panel’s contribution supported operational continuity and scalable infrastructure growth.


Project Highlights

  • MV transformers and cables supplied

  • 40MW high-capacity data mining infrastructure support

  • Invoiced and delivered in October 2025

  • Reliable supply coordination for energy-intensive operations