Project Overview
The Salalah 45MW Data Mining Farm project required large-scale electrical infrastructure to support continuous high-load operations. Designed for energy-intensive computing activities, the facility demanded reliable medium- and low-voltage systems capable of maintaining stable performance under sustained power consumption.
Our Role
Emirates Panel was engaged to supply key electrical infrastructure components supporting the facility’s power distribution architecture. The scope included coordination of medium-voltage and low-voltage equipment to ensure system reliability and compliance with project requirements.
Scope of Supply
Medium-voltage cables for primary power distribution
Ring Main Units (RMUs) for MV network switching and protection
Medium-voltage transformers for step-down power conversion
Low-voltage panels for downstream power distribution
Technical documentation and coordination support
Challenges & Solutions
High-capacity data mining facilities require stable power delivery with minimal downtime. Emirates Panel ensured proper specification alignment between MV and LV systems, coordinated delivery schedules, and supported smooth integration across the power infrastructure chain.
Outcome
The supplied MV and LV infrastructure components enabled reliable power distribution across the 45MW data mining facility. Emirates Panel’s involvement supported operational continuity and scalable infrastructure development.
Project Highlights
MV cables, RMUs, transformers, and LV panels supplied
45MW high-capacity infrastructure support
Invoiced and delivered in December 2023
Reliable supply coordination for energy-intensive operations